× HomeAbout UsOpen letterGeneral introductionOrganizational structureConstruction FieldCivil & industrial construction worksInfrastructure - trafficBundle - separatorEventsAlbumRecruitmentContact General information Completion time Investor Address Prev Next Completed Projects 03/08/2019 BUILDING DAN CHU BRIDGES AND LINKS AT VSIP II-A 03/08/2019 D20 ROAD - SHTP - HCM CITY 09/11/2023 Construction Vam Tu Road and Bridge 09/11/2023 Construction Canal Embankment, VSIP III, Binh Duong Province 09/11/2023 Construction of pumping station system number 5 at VSIP III Other constructions DESIGN AND CONSTRUCTION OF PHASE 3 OF READY-BUILT FACTORY AT VSIP II-A, BINH DUONG PROVINCE THAI KK COMPANY WAREHOUSE CAI LAN VEGETABLE OIL FACTORY OPODIS PHARMACEUTICAL FACTORY DESIGN & CONSTRUCTION OF READY-BUILT FACTORY IN VSIP II-A INDUSTRIAL PARK Project: Design and construction of ready-built factory phase 1 at lot XXIX, road 28, VSIP II-A industrial park, Binh Duong province WERNER-VSIP II Factory Extension RENOVATION OF 10 SOLID WASTE TRANSFER STATIONS IN THE CITY TAEDOO FACTORY, SHINWOO, MI RAE DESIGN AND CONSTRUCTION OF READY-BUILT FACTORY AT LOT 231 AT VSIP II-A, BINH DUONG PROVINCE FIRE PROTECTION STATION CONSTRUCTION-VSIP II ICHIHIRO factory construction DESIGN & CONSTRUCTION OF READY-BUILT FACTORY PHASE 2 VSIP II-A INDUSTRIAL PARK