DESIGN AND CONSTRUCTION OF READY-BUILT FACTORY AT LOT 231 AT VSIP II-A, BINH DUONG PROVINCE

General information

Construction of phase 231 of the factory block with a construction floor area of ​​approximately 11,594 m2.

Implementation of the design package includes:

  • Architectural design
  • Structural and infrastructure design
  • Electrical system design

Implementation of the construction package includes:

  • Construction of the factory block with a total floor area of ​​approximately 11,594 m2, including the office area
  • Infrastructure works such as internal roads, rainwater drainage systems, wastewater, water supply systems for the factory blocks.
  • Fire alarm and fire fighting systems
  • Electrical systems
  • Communication systems
  • Lighting systems for office areas and lighting outside the factory
  • Preparing the site for the internal green area
  • Restoring existing roads and sidewalks
  • Building a guard house.
Completion time 11/08/2019
Investor Vietnam – Singapore Industrial Park Joint Venture Company Limited (VSIP)
Address No. 8, Friendship Avenue, VSIP Building, Thuan An District, Binh Duong Province

Nguyen Cat Investment & Construction Co., Ltd. is a reputable unit in the field of design and construction of factories at VSIP II-A, Binh Duong province with many completed projects. We have a team of architects with many years of experience in the industry. Nguyen Cat Company is always ready to receive all requests for quotations and consultation on factory construction from customers and investors.

The pre-built factory project at lot 231 at Vsip II-A, Binh Duong province was started in December 2018. The project was built on a construction floor area of ​​about 11,594m2 by Nguyen Cat Company as the main contractor and completed the construction to safety standards in August 2019.

The factory design and construction project was carried out at an extremely reasonable cost, along with a standard factory construction process, helping the project to be completed quickly and put into effective operation.

Work to implement office area and infrastructure works includes:

Implementation of the design package includes:

  • Architectural design
  • Structural and infrastructure design
  • Electrical system design

Implementation of the construction package includes:

  • Construction of the factory block with a total floor area of ​​approximately 11,594 m2, including the office area
  • Infrastructure works such as internal roads, rainwater drainage systems, wastewater, water supply systems for the factory blocks.
  • Fire alarm and fire fighting systems
  • Electrical systems
  • Communication systems
  • Lighting systems for office areas and lighting outside the factory
  • Preparing the site for the internal green area
  • Restoring existing roads and sidewalks
  • Building a guard house.

Why should you choose Nguyen Cat Construction Investment Company as the contractor?

  • We are a reputable contractor with many years of experience in the field of construction of technical infrastructure for industrial parks, factories, and roads.
  • With more than 18 years of capacity and experience affirmed through many projects, Nguyen Cat is trusted by many investors to be the contractor for large and small projects in and outside Binh Duong province.
  • Commitment to "Quality - Reasonable price - On schedule" for investors.

For all needs of factory design and construction, investors should contact Hotline: 028.62 590 496 - 62 590 499 immediately to receive free consultation and quick quotation from Nguyen Cat staff.