Construction Canal Embankment, VSIP III, Binh Duong Province


Supply of materials, equipment and construction at VSIP III embankment, Binh Duong province, Vietnam. Implementation time is 8 months.
The VSIP III landscape lake embankment construction project is one of many projects that VSIP cooperates with Nguyen Cat. Continuing long-term cooperation with the VSIP investor. This is a testament to our capacity and reputation - the leading unit in the design and construction of industrial works, landscape embankments, traffic works, etc.
Works of the VSIP III landscape lake embankment construction project include:
- Excavation to the design elevation of the canal
- Construction of structural parts on both sides of the embankment including piles, water retaining wall foundations, landscape structural floors, and resting area structural floors.
- Reinforcement of waterproofing on the embankment with concrete and stone with HDPE tarpaulin according to regulations.
- Supply and installation of railings
With more than 18 years of experience in the field of design and construction, we have affirmed our name. We believe that with our capabilities, Nguyen Cat will be the best choice to implement your green building project.
With a team of leading experts, we are committed to providing customers with the most optimal and unique solutions for each specific project, creating a landscape space that is not only aesthetic and modern but also meets the budget and is sustainable over time.