× HomeAbout UsOpen letterGeneral introductionOrganizational structureConstruction FieldCivil & industrial construction worksInfrastructure - trafficBundle - separatorEventsAlbumRecruitmentContact General information Completion time 28/06/2025 Investor Address Prev Next Completed Projects 03/08/2019 BUILDING DAN CHU BRIDGES AND LINKS AT VSIP II-A 03/08/2019 D20 ROAD - SHTP - HCM CITY 09/11/2023 Construction Vam Tu Road and Bridge 09/11/2023 Construction Canal Embankment, VSIP III, Binh Duong Province 09/11/2023 Construction of pumping station system number 5 at VSIP III Other constructions BUILDING DAN CHU BRIDGES AND LINKS AT VSIP II-A Asphalt concrete inter-hamlet 3-4 (phase 2) AN SON ROAD CONSTRUCTION 01 War Zone D Memorial Park Renovating Cai stream (from Dan Chu Bridge to Hoa Loi Bridge) and Ban Kho Gao stream (From DB4 bridge to D3 bridge) - VSIP II-A CONSTRUCTION OF WASTE WATER LINE AND PUMP STATION AT SUOI TRE residential area - VSIP II-A Project: Supply of materials, equipment and infrastructure construction of Hamlet 4 Vinh Tan residential area at VSIP II-A (Phase 3), Binh Duong Supply of materials, equipment and infrastructure construction of XN1A road and internal road of Sun Casa commercial center Infrastructure construction of N4 (03-D3A) + Road DH1+DH2+DH3+DH4 At Phase 1- VSIP III (100 Ha). MUOI MUON ROAD TO TAN THANH ROAD 20 - VSIP IIA Upgrading the route from National Highway 13 (Bridge and Road 76) - Ong Nam Dong T-junction Project: Constellation of Suoi Don Chom Sao BIDDING PACKAGE 01 - VSIP IIA D20 ROAD - SHTP - HCM CITY REPAIR OF THE ROAD TO BINH DIEN Shopping Center (FROM NGUYEN VAN LINH STREET TO TOLL STATION) RESETTLEMENT AREA 1 VINH TAN Hamlet Supplying materials, equipment and building infrastructure for residential area Hamlet 1 Vinh Tan - VSIP II-A (P.3) TAN BINH RESETTLEMENT AREA + D21 Road CONSTRUCTION PACKAGE NUMBER 04 - CHANNEL T4 - DRAINAGE SYSTEM IN DI AN TOWN AND TAN DONG HIEP IP Construction Vam Tu Road and Bridge ROAD 11 - SAIGON HI-TECH PARK - HO CHI MINH CITY The road to the historical site of the Ho Chi Minh Campaign Front Command Construction of pumping station system number 5 at VSIP III Construction Canal Embankment, VSIP III, Binh Duong Province CONSTRUCTION OF CHET RIVER GIA TAN INTERNATIONAL ROAD - TAY NINH Concrete construction of pavement of resettlement area at Hamlet 04 Vinh Tan at VSIP II-A (package 02) Works: drainage system in Di An town and Tan Dong Hiep Industrial Park Site clearance and land preparation for 44.79 ha to LEGO - VSIP III SUPPLYING MATERIALS, EQUIPMENT AND BUILDING HOA LOI BRIDGE AT VSIP II-A ROAD FROM AN SON TO BINH DUONG Project: Bung Hiep - Suoi Cat drainage ROAD 12 - SAIGON HI-TECH PARK - HO CHI MINH CITY Construction and repair of N1 road phase 2 in Hoa Loi Residential Area (325m) CONSTRUCTION LAI THIEU ROAD PKV-21a (the road to the Center of Culture - Sport) Construction of resettlement area for protection forest in Cau Mountain - Dau Tieng Project: Design and construction of road 28 (D3-D4) at VSIP II-A, Binh Duong