Project: Design and construction of road 28 (D3-D4) at VSIP II-A, Binh Duong

General information

Project: Design and construction of Road 28 (D3-D4) at VSIP II-A, Binh Duong

Survey of current site, existing utilities and implementation of infrastructure design for Road 28 (D3-D4).

Completion time 8/2020
Investor Vietnam - Singapore Industrial Park (VSIP) Joint Venture Company Limited

The design and construction project of Road 28 (D3-D4) at VSIP II-A, Binh Duong was completed and handed over to the investor in August 2020. This is a typical project among many projects that Nguyen Cat Company cooperated with VSIP II-A. It is a proof of a reputable and professional design and construction unit for all projects, handing over according to standards and on schedule as committed.

Construction work includes:

  • Clearing the construction site;
  • Leveling the ground:
  • Construction of the road system,
  • Construction of the rainwater drainage system;
  • Construction of the wastewater drainage system;
  • Construction of the water supply system;
  • Construction of underground electrical and telecommunication pipes across the road and electrical and lighting pipes on the sidewalk;
  • Protect and restore the original state of infrastructure works, roads, sidewalks, ... and/or other works that are existing and/or under construction during the construction phase and/or after the construction phase,
  • Acceptance and handover;
  • Other works as required by the Investor.