Project: Design and construction of road 28 (D3-D4) at VSIP II-A, Binh Duong






















General information
Project: Design and construction of Road 28 (D3-D4) at VSIP II-A, Binh Duong
Survey of current site, existing utilities and implementation of infrastructure design for Road 28 (D3-D4).
Completion time
8/2020
Investor
Vietnam - Singapore Industrial Park (VSIP) Joint Venture Company Limited
The design and construction project of Road 28 (D3-D4) at VSIP II-A, Binh Duong was completed and handed over to the investor in August 2020. This is a typical project among many projects that Nguyen Cat Company cooperated with VSIP II-A. It is a proof of a reputable and professional design and construction unit for all projects, handing over according to standards and on schedule as committed.
Construction work includes:
- Clearing the construction site;
- Leveling the ground:
- Construction of the road system,
- Construction of the rainwater drainage system;
- Construction of the wastewater drainage system;
- Construction of the water supply system;
- Construction of underground electrical and telecommunication pipes across the road and electrical and lighting pipes on the sidewalk;
- Protect and restore the original state of infrastructure works, roads, sidewalks, ... and/or other works that are existing and/or under construction during the construction phase and/or after the construction phase,
- Acceptance and handover;
- Other works as required by the Investor.
SOME CONSTRUCTION IMAGES: