CONSTRUCTION OF WASTE WATER LINE AND PUMP STATION AT SUOI TRE residential area - VSIP II-A


Supply of materials, equipment and construction of wastewater lines and pumping stations at Suoi Tre Residential Area - VSIP II-A
The project builds a wastewater treatment system to control environmental pollution caused by urban wastewater, increase people's access to services to improve wastewater quality, protect water quality, and protect public health.
The wastewater pumping station is an important part of the modern urban drainage system, helping to minimize environmental risks and ensure safe and efficient wastewater transportation.
The project meets the set standards and was completed in 2019. The project is in the field of industrial infrastructure construction.
Implementation items:
- Preparing the construction site for construction
- Construction of wastewater drainage system
- Construction of pumping station
- Protecting existing utilities and green areas around the construction area
- Acceptance and handover and other works as required by the Investor.
Construction of wastewater lines and pumping stations at Suoi Tre Residential Area received the assessment of a reputable and quality construction contractor from the investor Vsip II. This is a great motivation contributing to helping Nguyen Cat Company develop strongly, striving to become a leading unit in the construction industry.
Completed Projects
-
03/08/2019
D20 ROAD - SHTP - HCM CITY
-
09/11/2023