Project: Major repair of the road to Binh Dien Commercial Center (from Nguyen Van Linh Street to the market toll station)
Items: repair of drainage manholes, sidewalk construction, lighting, road surface construction.
Binh Dien Trade Center was invested and built on low-lying land by Saigon Trading Corporation, with an area of 65 hectares, started construction in March 2003, at a strategic location for both road and waterway traffic.
The investment progress to date has basically completed the investment and construction on a total area of 34 hectares (out of a total of 65 hectares) and is continuing to prepare to complete projects on the remaining area. In addition, the Market Company has also organized many types of utility services to ensure the Market operates well.
The items for which Nguyen Cat Company is the main contractor are: construction and repair of drainage manholes, construction of sidewalks, lighting, and road surface construction. The project was completed to meet standards and on schedule and handed over to the investor, Urban Traffic Management Board No. 4, in 2019.
The successful project received positive reviews from the investor, a reputable and professional contractor
Nguyen Cat Investment and Construction Company Limited specializes in internal road construction - site leveling - construction works - asphalt road repair. Design, construction, upgrade and repair of traffic works, internal road works for civil and industrial works. Contract construction of industrial, civil, factory, traffic works, excavation and site leveling, water supply and drainage and supply of construction materials at good prices.
Professional, quality construction, always ensuring the committed schedule. For all needs, customers and investors, please contact us for the fastest consultation.