Renovating Cai stream (from Dan Chu Bridge to Hoa Loi Bridge) and Ban Kho Gao stream (From DB4 bridge to D3 bridge) - VSIP II-A

General information

Consolidation and renovation of Cai stream (Dan Chu bridge - Hoa Loi bridge) and Ban Kho Gao stream (DB4 bridge - D3 bridge) - VSIP II-A

Completion time 2023
Investor Vietnam - Singapore Industrial Park Joint Venture Company Limited
Address From Democracy Bridge to Hoa Loi Bridge & Ban Kho Gao Stream (from DB4 Bridge to DB3 Bridge) at VSIP II-A

The project of dredging, reinforcing and renovating Suoi Cai, invested by Vsip II-A, is very important in draining water, creating landscape, and beautifying a large area of ​​land. This is a project that the investor focuses on, so the construction progress is always accelerated by the contractor.

Work to be done:

  • Providing enough materials, equipment and implementing the construction of Reinforcing and renovating Suoi Cai (Dan Chu bridge - Hoa Loi bridge) and Suoi Ban Kho Gao (DB4 bridge - D3 bridge) - VSIP II-A according to the design and requirements of the Investor, including but not limited to:
  • Site preparation;
  • Reinforcing gabions;
  • Reinforced concrete work, tray feet, upstream locking, pouring concrete at the head of the ditch;
  • Commune gate;
  • Construction of railings;
  • Other supported means
  • Operation, acceptance and handover and other works as required by the Investor

Nguyen Cat Company is the contractor cooperating with Vsip through many projects. This confirms that we have full technical standards, experience and professional capacity, ensuring the quality and safety of construction works.

All construction projects are completed on schedule and meet committed quality standards.

Dear customers and investors, who are looking for a reputable contractor with competitive prices and excellent quality, please contact us immediately. We are ready to answer any questions related to your future project.

Contact information: NGUYEN CAT INVESTMENT - CONSTRUCTION COMPANY LIMITED

  • Head office: 529/19 Nguyen Tri Phuong, Ward 8, District 10, Ho Chi Minh City, Vietnam.
  • Branch 1: K37, Thoi An Residential Area, Le Thi Rieng, Thoi An Ward, District 12, HCM
  • Branch 2: DT742, Bao Goc Hamlet, Binh My Commune, Bac Tan Uyen, Binh Duong.
  • Phone: 028.62590496 – 62590499
  • Email: hcns@nguyencat.com.vn
  • Website: www.nguyencat.com.vn

 

Other constructions

TOP