Infrastructure construction of N4 (03-D3A) + Road DH1+DH2+DH3+DH4 At Phase 1- VSIP III (100 Ha).








Supply of materials, equipment and construction of infrastructure for Road N4 (D3-D3A), Road DH1, DH2, DH3, DH4 - Phase 1 - VSIP III (100ha).
Implementation time: 8 months
The project of constructing infrastructure of N4 road (D3-D3A), DH1, DH2, DH3, DH4 roads Phase 1 - VSIP III (100ha) was constructed by Nguyen Cat Company as the main contractor according to the design and requirements of the Investor, including the following items:
- Clearing the construction site including moving the organic soil layer
- Excavation
- Construction of the road system
- Construction of the rainwater drainage system
- Construction of the wastewater drainage system
- Construction of underground electrical and telecommunication pipes across the road and lighting system
- Protecting and restoring the original state of utility infrastructure works, roads, sidewalks... and/or other works that are existing and/or under construction during the construction phase and/or after the construction phase
- Operation, acceptance and handover and other works as required by the Investor
The project was handed over on schedule as committed to the VSIP III investor.
Investing in the construction of road infrastructure contributes to gradually completing the infrastructure according to the urban traffic network planning, improving exploitation capacity, ensuring traffic safety, urban aesthetics, meeting traffic needs.
Completing the construction of the infrastructure of road N4 (D3-D3A), road DH1, DH2, DH3, DH4 not only attracts investors but also helps transport goods in the area at present and in the future.
Nguyen Cat Company has more than 18 years of experience in the construction industry, construction of infrastructure, traffic works, industrial park factory works, owning a team of human resources, equipment and machinery, especially a stable financial source, will ensure that all projects are completed on schedule and ensure quality. We are ready to receive all requests for consultation and quotation from customers and investors.