SUPPLYING MATERIALS, EQUIPMENT AND BUILDING HOA LOI BRIDGE AT VSIP II-A


















Supplying materials, equipment and constructing Hoa Loi bridge at VSIP II-A
Hoa Loi Bridge is part of the infrastructure system at Vsip II A, more than 50m long, creating a connection between Road No. N1 and Road No. 12 in Vsip II Industrial Park through Suoi Cai, flowing from the beginning of Hoa Loi Commune to Dan Chu Street and then out to Dong Nai River.
Hoa Loi Bridge, after being built, will create easy connection and trade for vehicles operating in the residential area as well as bring convenience to people in Hoa Loi Commune.
The Hoa Loi Bridge construction project was built by Nguyen Cat Company, providing construction materials and equipment, and was completed in August 2020.
Nguyen Cat Company performed the following tasks:
- Bridge section: Upper and lower structure and reinforcement of the embankment of the bridgehead.
- Approach road to the bridge: Prepare the ground, road system, rainwater system, reinforce the stream.
- Lighting system;
- Protect and restore the original state of infrastructure works, roads, sidewalks, ... and/or other adjacent works during the construction phase or after the construction phase.
- Acceptance and handover;
- Other tasks as required by the Investor.
- Along with a team of highly skilled engineers, project construction staff. In addition, indispensable equipment and machinery to support the construction process such as excavators, bulldozers, cranes ...
During the construction process, we strengthen management, inspection, supervision, and improve the quality of the project. Ensure environmental sanitation. Focus on creating environmental landscapes and common spaces for projects upon completion. Always focus on ensuring labor safety throughout the construction site, at all times, absolutely not allowing labor safety incidents to occur.