Construction of pumping station system number 5 at VSIP III






Project: Supply of materials, equipment and construction of pumping station system No. 5 at VSIP III
The pumping station system is a combination of hydraulic works and electromechanical equipment ... to ensure water is taken from the water source, transported and pumped to the place of use or excess water needs to be drained elsewhere.
The Project to build pumping station system No. 5 at VSIP II (VSIP III) was recognized by the Investor and highly appreciated for the sense of responsibility of the contractor who promptly started to build the construction items to meet the requirements of quality, in accordance with the design, speed up the construction progress, and strive to complete the project. The commencement of construction of pumping station No. 5 not only serves the daily life and production of the industrial park but also ensures infrastructure safety, creating peace of mind for investors when operating in VSIP III Industrial Park.
Completed Projects
-
03/08/2019
D20 ROAD - SHTP - HCM CITY
-
09/11/2023