MUOI MUON ROAD TO TAN THANH


Road construction package, drainage system section Km8+170-KM10+050
Road construction project from Muoi Muon intersection to Tan Thanh intersection, Tan Uyen district, Binh Duong province.
Total length of the entire route is 1880m.
Construction items: Traffic system; Rainwater drainage system; Lighting system and trees
The construction project of Muoi Muon road to Tan Thanh intersection is being constructed with a length of more than 1880m. The project has a very important meaning and role in synchronously connecting the traffic infrastructure between the center of Tan Uyen town and the center of Bac Tan Uyen district, passing through Dat Cuoc Industrial Park, connecting with the Bac Tan Uyen-Phu Giao-Bau Bang dynamic road, Thu Bien-Dat Cuoc road is being urgently deployed to attract investment, exploit and promote the potential advantages of the region.
After the project is completed and put into use, it will ensure the traffic needs of the people and connect the traffic infrastructure in the area and develop the economy, contributing to promoting the development of the local economy.
Completed Projects
-
03/08/2019
D20 ROAD - SHTP - HCM CITY
-
09/11/2023